Go to BuildTreks Home




Note: Going home clears all of these panels.

Synchronize panels by clicking the panel directional buttons found at the top of the panel.

Synchronize panels by clicking the panel directional buttons found at the top of the panel.

Synchronize panels by clicking the panel directional buttons found at the top of the panel.

Synchronize panels by clicking the panel directional buttons found at the top of the panel.


Get
NPS 2011, Concrete Waste Factor 10 Percent

Net Present Value Cost Calculation View

Change by Year

Introduction
This tool generates a variety of basic net present value cost stock statistics for DevTreks inputs.

Calculation View Description
v200a

Version: 1.7.0

Feedback About commercial/input/NPS 2011, Concrete Waste Factor 10 Percent/2147397457/inputnpvchangeyr

Step 1 of 3. Make Selections


Step 2 of 3. Analyze

Relations

Use In Childs?
Overwrite Childs?
Compare Using:
Display Full View:

Step 3 of 3. Save

Method 1. Do you wish to save step 2's calculations? These calculations are viewed by opening this particular calculator addin.

Instructions (beta)

Step 1

  • Step 1. The accompanying tutorial contains a reference that explains these analyzers.
  • Step 1. Base Calculations To Analyze: Make sure that the data being analyzed corresponds to outputs.
  • Step 1. Analysis Type:The Analysis Type that is saved should match the name of this analyzer.

Step 2

  • Step 2. Use Same Calculator Pack In Descendants?: True to insert or update this same calculator in children.
  • Step 2. What If Tag Name: Instructional videos explaining the use of what-if scenario calculations should be viewed before changing or using this parameter.
  • Step 2. Base Resource Calculations To Analyze Type: The calculator chosen should actually be used, and used fairly frequently, in the underlying data being analyzed.
  • Step 2. Related Calculators Type: Name of the "Related Calculator Type" found in descendants. Runs calculations using the data found in those descendant linked views. This property takes precedence over the "Base Resoure Calculations to Analyze Type" property.
  • Step 2. Alternative: Used for comparisons.
  • Step 2. Target Type: Used for progress analysis and to set benchmarks and actuals.

Step 3

  • Step 3. Save Using: The Save command saves xml data the Save Text command saves csv data.


Reminder: The 'Resource Stock Totals' analyzer requires running the underlying LCA calculator after inserting, deleting, or updating, this linked view (that keeps the LCA calculator's linked views synchronized with these linkedviews).


Current view of document
NPS 2011, Concrete Waste Factor 10 Percent
Input Group : A1030 SLAB ON GRADE ; A1030
Input AllAlt. 0
Name NPS 2011, Concrete Waste Factor 10 Percent
Label 03.30.53
Input Series AllAlt. 0Alt. 1Alt. 2Alt. 3Alt. 4
Name NPS 2007, Concrete Waste Factor 10 PercentNPS 2008, Concrete Waste Factor 10 PercentNPS 2009, Concrete Waste Factor 10 PercentNPS 2010, Concrete Waste Factor 10 PercentNPS 2011, Concrete Waste Factor 10 Percent
Label 03.30.5303.30.5303.30.5303.30.5303.30.53
Observations 11111
Alternative
OC Total 0.000.000.000.000.00
OC AmountChange 0.000.000.000.000.00
OC PercentChange 0.000.000.000.000.00
OC BaseChange 0.000.000.000.000.00
OC BasePercentChange 0.000.000.000.000.00
AOH Total 0.000.000.000.000.00
AOH AmountChange 0.000.000.000.000.00
AOH PercentChange 0.000.000.000.000.00
AOH BaseChange 0.000.000.000.000.00
AOH BasePercentChange 0.000.000.000.000.00
CAP Total 235.30237.30240.30242.30248.30
CAP AmountChange 0.000.003.002.006.00
CAP PercentChange 0.000.001.260.832.48
CAP BaseChange 0.002.005.007.0013.00
CAP BasePercentChange 0.000.852.122.975.52
Total Total 235.30237.30240.30242.30248.30
Total AmountChange 0.000.003.002.006.00
Total PercentChange 0.000.001.260.832.48
Total BaseChange 0.002.005.007.0013.00
Total BasePercentChange 0.000.852.122.975.52
Incent Total 0.000.000.000.000.00
Incent AmountChange 0.000.000.000.000.00
Incent PercentChange 0.000.000.000.000.00
Incent BaseChange 0.000.000.000.000.00
Incent BasePercentChange 0.000.000.000.000.00
Net Total 0.000.000.000.000.00
Net AmountChange 0.000.000.000.000.00
Net PercentChange 0.000.000.000.000.00
Net BaseChange 0.000.000.000.000.00
Net BasePercentChange 0.000.000.000.000.00
Dataset: NPS 2011, Concrete Waste Factor 10 Percent IRI This building construction cost estimate is computed using life cycle cycle input calculators and totals, statistics, incremental change, and progress analyzers.









Uploading a new file will replace any existing file. If necessary, please package and download the existing file prior to this action. If the file has been uploaded successfully, this page will refresh and show the new file information. If the file can't be uploaded (i.e. exceeds 60MB, unsupported mimetype, bad xml, bad html) this page will refresh and show the existing file information.

The file has been uploaded.